Interactive 3D model of the CubeSat. Use the controls to rotate or explode the view to see the internal subsystem stack. Notice how failures affect the physical render dynamically.
Dynamic Budget
3U Constraint: < 4000g| Subsystem | Mass (g) | Power (W) | % Power |
|---|
Power Limit: 4.2W / 8.0W Max
// Subsystems
// Select a Subsystem
// Mission Control
T+ 00.0s
// System Log
T+00:00Systems initialized. Awaiting mission start.